Details
-
Enabler
-
Should have
-
None
-
Data Processing, Obs Mgt & Controls, LOW ART
-
15
-
REL-1439 PST v0.12.0
-
Team_BUTTONS, Team_CREAM, Team_MCCS, Team_NAKSHATRA, Team_PST, Team_SAHYADRI, Team_STARGAZER
-
-
-
Description
Attachments
Issue Links
- Is affected by
-
ROAM-500 Without TMC integration with CSP the PST Tied-Array Beamforming capability will not be available for AA0.5
- Active Risk
- Is delivered by
-
REL-1439 PST v0.12.0
- Planned
- Parent Of
-
SP-3243 Create a LOW Observation Jupyter Notebook to cover multiple PST scans and add usage improvements
-
- Analyzing
-
-
SP-4218 Prepare ODT for AA0.5 usage
-
- Program Backlog
-
-
SP-4225 TMC Low capable of controlling and monitoring tied-array beam (PST) observations
-
- Program Backlog
-
-
SP-3800 Complete the implementation of ECP-230134, updating SPS-CBF SPEAD time fields
-
- Implementing
-
-
SP-4219 Ensure OSO tools and associated components are ready for early AA0.5 usage
-
- Implementing
-
-
SP-4221 Implementation of Abort
-
- Discarded
-
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
Type | Key | Summary | Status | Assignee | ARTs | Agile Teams | FPs | P | FixVersion | Due Sprint | |
---|---|---|---|---|---|---|---|---|---|---|---|
|
SP-4225 | TMC Low capable of controlling and monitoring tied-array beam (PST) observations |
Program Backlog | Vrcic, Sonja |
Obs Mgt & Controls
|
Team_SAHYADRI
|
2 | PI23 | Sprint 2 | ||
|
SP-4219 | Ensure OSO tools and associated components are ready for early AA0.5 usage |
Implementing | Avison, Adam |
Obs Mgt & Controls
|
Team_BUTTONS, Team_NAKSHATRA, Team_STARGAZER
|
6 | PI23 | Sprint 3 | ||
|
SP-4218 | Program Backlog | Klaassen, Pamela |
Obs Mgt & Controls
|
Team_BUTTONS
|
3 | PI23 | Sprint 3 | |||
|
|
Discarded | Franzen, Thomas |
LOW ART
|
2 | PI23 | Sprint 4 | ||||
|
SP-3243 | Create a LOW Observation Jupyter Notebook to cover multiple PST scans and add usage improvements |
Analyzing | Avison, Adam |
Obs Mgt & Controls
|
3 | PI23, PI24 | ||||
|
SP-3800 | Complete the implementation of ECP-230134, updating SPS-CBF SPEAD time fields |
Implementing | Mohile, Vivek |
LOW ART
|
Team_MCCS
|
1 | PI21, PI22, PI23 | Sprint 3 |