Description
In PI13 we will continue re-integrating different software components as part of SKAMPI, following the revised repository structure and CI automations.
Milestones should be identified at PI planning representing the integration events so that an integration timeline can be populated with details for PI13.Â
Possible components include:Â TMC, OET, MCCS, SDP, CSP LMC, Taranta (already happening at the end of PI12), skuid.
Â
For each component it shall be evaluated what level of testing is achievable in the current configuration of the SKAMPI platform. If end-to-end tests that exercise the single component can be executed this should always take precedence. Execution of acceptance tests defined at component level also provides valuable information.Â
For each component we will strive to have:
- to be migrated to pipeline machinery, common directory structure, standard poetry and pytest implementation
- component tests that target standalone and integrated scenarios (identified by marks)
- published image that also contains tests, poetry.lock, pyproject.toml, and tests/pytest.ini
- a component helm chart that integrates into an umbrella chart
- an implementation review covering deployment architecture, performance and test coverage
- a code review based around an integration Merge Request
- both as part of the cross team review process
- fitness for integration acceptance from the owners
- merging and releasing (REL process)
Attachments
Issue Links
- is cloned by
-
SS-90 Reintegrate missing components into SKAMPI
- Done
- Parent Of
-
SP-2057 Re-enable SDP deployment and testing with SKAMPI
- Done
-
SP-2095 Upgrade of CSP.LMC to the new Base Classes model
- Done
-
SP-2100 Refactor TMC Subarray Node in line with the Central Node (SS-82 follow on)
- Done
-
SP-2101 Refactor TMC Leaf Nodes in line with the Central Node (SS-82 follow on)
- Done
-
SP-2105 Conduct Smoke tests for 4 Taranta components and improve documentation
- Done
-
SP-2146 Initial SDP AA0.5 visibility receive workflow and test preparation
- Done
-
SP-2195 Re-enable OET deployment and testing with SKAMPI
- Done
-
SP-2204 Re-integrate the SKUID service into SKAMPI
- Done
-
SP-1839 Create releases for SDP components deployed with SKAMPI
- Done
-
SP-1951 Fast and agile skampi pipeline
- Discarded
-
SP-2196 Residual work in SS-86 not covered in other features
- Discarded
- relates to
-
SP-2225 Skampi Health Checkup
- Discarded
-
SP-2194 Dev Portal and Onboarding Update for Pipelines/Templates and Minikube
- Done
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- mentioned on