Description
This feature will bring the TMC Leaf Nodes in line with the Central Node following the CN refactor conducted in PI12 (as part of SS-82).
The Leaf Nodes will be re-integrated back into SKAMPI as part of this feature.
The scope of this Feature will be determined during detailed planning. If the scope of work exceeds the team capacity, SDP Leaf Node should be integrated first.
Priority of other Leaf Nodes shall be determined based on readiness of the sub-systems (DISH Prototype, MCCS, CSP).
Attachments
Issue Links
- Child Of
-
SS-86 Reintegrate single software components into SKAMPI
- Done
- is required by
-
SP-2262 Integration effort: End-to-End On/Off Command Test: OET → TMC → SDP