Details
-
Feature
-
Won't have (this time)
-
None
-
Obs Mgt & Controls
-
-
Inter Program
-
2
-
20
-
10
-
Sprint 5
-
-
-
16.3
Description
This feature was brought forward from PI13 into PI14.
A feature to conclude work conducted in PI13 as part SS-86.
Following the reintegration into SKAMPI of the OMC software components:
TMC SubarrayNode (SP-2100)TMC a subset of LeafNodes (SP-2101), specifically:
i) SDP Subarray Leaf node
ii) SDP Master Leaf NodeOET (SP-2195)SKUID (SP-2204)
An end-to-end test will be established to transmit an On (and Off) command from the OET via the TMC (and sub-components therein) to the SDP, leaving the SDP in the On (Off state).
Attachments
Issue Links
- depends on
-
SP-2057 Re-enable SDP deployment and testing with SKAMPI
- Done
-
SP-2100 Refactor TMC Subarray Node in line with the Central Node (SS-82 follow on)
- Done
-
SP-2101 Refactor TMC Leaf Nodes in line with the Central Node (SS-82 follow on)
- Done
-
SP-2102 Update TMC nodes to utilise base class version 0.11.3
- Done
-
SP-2195 Re-enable OET deployment and testing with SKAMPI
- Done
-
SP-2204 Re-integrate the SKUID service into SKAMPI
- Done
- relates to
-
SP-2364 SDP Integration in an end-to-end software deployment
- Done