Details
-
Feature
-
Not Assigned
-
None
-
Data Processing
-
-
-
2
-
2
-
26.5
-
Team_YANDA
-
Sprint 5
-
-
-
-
9.1
-
Stories Completed, Integrated, BDD Testing Passes (no errors), Outcomes Reviewed, NFRS met, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
-
-
SPO-705
Description
Feature to complete work started in PI6 and continued in PI7 by the YANDA team developing the SDP a visibility receive workflow suitable for use at the PSI and with an evolutionary route towards what is expected to be deployed for early Array Assemblies.
Attachments
Issue Links
- depends on
-
SP-1023 Proof-of-concept of visibility streaming over apache arrow/plasma for real-time processing
- Done
- is cloned by
-
SP-1291 Deployment and test of integrated CSP.LMC-SDP ingest prototype to PSI Low
- Done
- is required by
-
SP-1419 Contribution to end-to-end PSI (LOW) integration and testing
- Done
- relates to
-
SP-1215 SDP prototype user documentation
- Discarded
-
SP-1179 Extend k8s platform performance tests to include buffer provisioning
- Funnel
-
SP-1156 Complete integration of signal displays for visibility receive
- Done
-
SP-1157 Integrate CBF-SDP emulator into the CBF LMC (and SKAMPI)
- Done
-
SP-1158 Prepare simulation scripts and data sets for PSI emulation modes
- Done
-
SP-1178 Test updated visibility receive code with preallocated nodes
- Discarded
-
SP-1215 SDP prototype user documentation
- Discarded
- triggers
-
ROAM-128 SPO-782 Learning Curve of Cross ART S/W components TMC CBF.LMC TANGO
- Retired
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- mentioned on