Details
-
Enabler
-
High
-
None
-
MID ART, Data Processing, Obs Mgt & Controls
-
9
-
Team_BUTTONS, Team_KAROO, Team_NAKSHATRA, Team_ORCA, Team_SAHYADRI, Team_STARGAZER, Team_YANDA
-
Sprint 5
-
-
Overdue
-
Description
Attachments
Issue Links
- depends on
-
ADR-94 Clarify requirements and design for Mid Holography observations
- decided
- Parent Of
-
SP-4218 Prepare ODT for AA0.5 usage
- Implementing
-
SP-4116 Dish.LMC - Support Band 5 downconverter interface
- Implementing
-
SP-4219 Ensure OSO tools and associated components are ready for early AA0.5 usage
- Done
-
SP-4220 TMC Mid capable of controlling and monitoring Holography observations
- Done
-
SP-4242 Enable Mid global pointing calibration and holography
- Done
- relates to
-
SS-163 Mid AA0.5 interferometric holography
- Implementing
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
Type | Key | Summary | Status | Assignee | ARTs | Agile Teams | FPs | P | FixVersion | Due Sprint | |
---|---|---|---|---|---|---|---|---|---|---|---|
SP-4218 | Implementing | Klaassen, Pamela |
Obs Mgt & Controls
|
Team_BUTTONS
|
6 | PI24 | Sprint 5 | ||||
SP-4116 | Implementing | Vrcic, Sonja |
MID ART
|
Team_KAROO
|
13 | PI23, PI24 | Sprint 5 | ||||
|
Ensure OSO tools and associated components are ready for early AA0.5 usage |
Done | Avison, Adam |
Obs Mgt & Controls
|
Team_BUTTONS, Team_NAKSHATRA, Team_STARGAZER
|
6 | PI23 | Sprint 3 | |||
|
Done | Ashdown, Mark |
Data Processing
|
Team_ORCA
|
3 | PI23 | Sprint 5 | ||||
|
TMC Mid capable of controlling and monitoring Holography observations |
Done | Bridger, Alan |
Obs Mgt & Controls
|
Team_SAHYADRI
|
3 | PI23 | Sprint 5 |