Details
-
Enabler
-
Not Assigned
-
None
-
Data Processing, Obs Mgt & Controls, Services
-
-
-
Description
We now have better configurability options for the SKAMPI product.
In order to deliver this capability, a team will have to collaborate in the context of the SKAMPI development so that at least one desirable SKAMPI configurations is identified, implemented and tested to help local development and testing.
Progress the work from SP-1603 & SP-1524 to include parametrisation for SDP and CBF.
Ideally, these could be framed as a set of features dealing with:
- Flowdown of configuration parameters to CSP LMC
- Flowdown of configuration parameters to SDP LMC
- Better define the high-level mechanism to provide such configuration in a way that includes LOW as well as MID
Alongside this, resource usage for the system as deployed, including:
- A feature to consolidate existing information about resource limits (
SP-1259), possibly leading to their definition in the solution intent; - Experiment with resource usage; and
- Identify, develop and publish useful sub-configurations of the deployed system:
- TMC only configuration
- TMC + SDP
Attachments
Issue Links
- Parent Of
-
SP-1649 Create robust test environment for VIOLA team
- Done
-
SP-1659 Improved UX for deploying, running, and testing SDP within SKAMPI
- Done
-
SP-1690 TMC Configurable deployment: Next Steps
- Done
-
SP-1608 Reduce Container Drag: Group TMC subarray nodes with subarray leaf nodes into a single device server
- Discarded
Type | Key | Summary | Status | Assignee | ARTs | Agile Teams | FPs | P | FixVersion | Due Sprint | |
---|---|---|---|---|---|---|---|---|---|---|---|
|
Reduce Container Drag: Group TMC subarray nodes with subarray leaf nodes into a single device server |
Discarded | Le Roux, Gerhard [X] (Inactive) |
Obs Mgt & Controls
|
1 | PI15 | |||||
|
Done | Bartolini, Marco |
Services
|
Team_VULCAN
|
1 | PI11 | Sprint 2 | ||||
|
Improved UX for deploying, running, and testing SDP within SKAMPI |
Done | Fenech, Danielle |
Data Processing
|
Team_SIM
|
2 | PI11 | Sprint 4 | |||
|
Done | Le Roux, Gerhard [X] (Inactive) |
Obs Mgt & Controls
|
Team_NCRA
|
3 | PI11 | Sprint 5 |