Capability
-
Should have
-
None
-
Data Processing, Obs Mgt & Controls
-
-
-
1
-
Sprint 5
-
-
-
Description
The MVP should be able to execute multiple scans within a single scheduling block execution, with the system optionally being reconfigured (different CSP setup, different pointing, different scan length, different SDP PBs) between the scans.
This should conform to the design developed in ADR-3 and ADR-4
- Spike to resolve final details;
- Link to multi-scan feature in DP train;
- Link to first SB use feature in OMC train;
- Change assignResources to pass all SDP configuration (all PBs);
- Align use of Configure command, not ConfigureScan.
Â
Â
Attachments
Issue Links
- is cloned by
-
SS-41 Complete multi-scan capability in the MVP (follow on)
- Done
- Parent Of
-
SP-872 Resolve details and issues in multi-scan and configure design
- Done
-
SP-873 Modify the assignResources command to the SDP to include full PB information
- Done
-
SP-875 Align use of the "configure" command in the MVP
- Done
-
SP-302 Control the MVP using the first Scheduling Block Instances
- Done
-
SP-786 Execution of receive workflow(s) for multiple scans
- Done
- mentioned on
Type | Key | Summary | Status | Assignee | ARTs | Agile Teams | FPs | P | FixVersion | Due Sprint | |
---|---|---|---|---|---|---|---|---|---|---|---|
|
Resolve details and issues in multi-scan and configure design |
Done | Santander-Vela, Juande |
Obs Mgt & Controls
|
Team_SSMT
|
2 | PI6 | Sprint 1 | |||
|
Done | Wortmann, Peter |
Data Processing
|
Team_SIM
|
3 | PI6 | Sprint 2 | ||||
|
Done | Bridger, Alan |
Obs Mgt & Controls
|
Team_BUTTONS
|
8 | PI6 | Sprint 5 | ||||
|
Done | Bridger, Alan |
Obs Mgt & Controls
|
Team_NCRA
|
4 | PI6 | Sprint 5 | ||||
|
Modify the assignResources command to the SDP to include full PB information |
Done | Espada, Daniel [X] (Inactive) |
Obs Mgt & Controls
|
Team_NCRA
|
2 | PI6 | Sprint 5 |