Description
Miro development frame: https://miro.com/app/board/uXjVN4N0K4c=/?moveToWidget=3458764578062924400&cot=14
Benefit hypothesis
Enable AIV and AA0.5 Science Commissioning activities that aim to test and analyse the capability to form a single tied-array beam, aligned with the centre (boresight) of the station beam.
What?
- The goal in AA0.5 is to configure a subarray to form a single PST beam and capture data in PST.
What is required:
- OSO scripting functions and (template/example) observation scripts produced to run an observation to capture tied-array beamformer data.
- TMC schema and logic updated to interpret, coordinate and monitor an observation involving the tied-array beamformer mode of the Low CBF with data capture in the PST.
- CSP.LMC schema and logic updated to interpret, coordinate and monitor an observation involving the tied-array beamformer mode of the Low CBF with data capture in the PST.
- SDP to provide tied-array calibration for a single bore-sight tied array beam.
- Delay polynomials required to integrate are provided by
SP-4028.
This Capability was de-scoped in PI22 due to lack of Capacity in TMC and LOW ITV Teams. Work will continue in PI23.
PI22 Plan
- LOW CBF and PST configuration schema updated.
- LOW CBF able to forma single PST beam at the boresight.
- PST able to receive and capture the beamformed data.
- CSP.LMC schema and logic updated to interpret, coordinate and monitor an observation involving the tied-array beamformer mode of the Low CBF with data capture in the PST.
- Integration will be performed in the LOW PSI.
- TMC component that calculates and publishes delay polynomials in
ADR-88format will be deployed in the LOW PSI (as delivered by https://jira.skatelescope.org/browse/SS-121). - Test execution will be via a Jupyter notebook which will configure and control TMC DM Generator and CSP.LMC.
Attachments
Issue Links
- depends on
-
SP-4028 TMC Delay Models (ADR-88 follow-on)
- Done
-
SS-121 Mid CBF delay polynomials: System integration for AA0.5
- Done
- Is delivered by
-
REL-1297 CSP.LMC Low v0.13.0
- Released
- Parent Of
-
SP-4092 PST Beamforming Tests
- Releasing
-
SP-4094 SPS Interface Update
- Releasing
-
SP-3800 Complete the implementation of ECP-230134, updating SPS-CBF SPEAD time fields
- Done
- relates to
-
SP-3243 Create a Low Observation Jupyter Notebook to cover multiple PST scans and add usage improvements
- Funnel
-
SP-4028 TMC Delay Models (ADR-88 follow-on)
- Done
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
Type | Key | Summary | Status | Assignee | ARTs | Agile Teams | FPs | P | FixVersion | Due Sprint | |
---|---|---|---|---|---|---|---|---|---|---|---|
SP-3243 | Create a Low Observation Jupyter Notebook to cover multiple PST scans and add usage improvements |
Funnel | Avison, Adam |
Obs Mgt & Controls
|
0.5 | PI25 | |||||
|
Done | Bridger, Alan |
Obs Mgt & Controls
|
Team_SAHYADRI
|
3 | PI22 | Sprint 4 | ||||
|
Done | Bridger, Alan |
Obs Mgt & Controls
|
Team_SAHYADRI
|
3 | PI22 | Sprint 4 | ||||
SP-4092 | Releasing | Krishnan, Hariharan |
LOW ART
|
Team_PERENTIE
|
4 | PI22 | Sprint 5 | ||||
SP-4094 | Releasing | Krishnan, Hariharan |
LOW ART
|
Team_PERENTIE
|
3.5 | PI22 | Sprint 3 | ||||
|
Complete the implementation of ECP-230134, updating SPS-CBF SPEAD time fields |
Done | Mohile, Vivek |
LOW ART
|
Team_MCCS
|
1 | PI21, PI22, PI23 | Sprint 5 |