Mid.CBF 4-Receptor Correlator part 2

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • MID ART
    • Hide

      A reliable 4-receptor correlator is core functionality that is needed for a functional AA0.5 SKA telescope.

      Show
      A reliable 4-receptor correlator is core functionality that is needed for a functional AA0.5 SKA telescope.
    • Hide
      • The nightly tests are updated to run on 4 talon boards.
      • The Mid CBF Signal Chain Verification test (XTP-25202) is updated to include a new test scenario as defined by the Test_6 test parameters.
      • Existing single board correlation tests still pass.
      Show
      The nightly tests are updated to run on 4 talon boards. The Mid CBF Signal Chain Verification test (XTP-25202) is updated to include a new test scenario as defined by the Test_6 test parameters. Existing single board correlation tests still pass.
    • 5
    • 5
    • 0
    • Team_CIPA
    • Sprint 5
    • Hide
      • CBF nightly tests updated to run on 4 talon boards.
      • Updated Mid CBF Signal Chain Verification test (XTP-25202) to include a new 4VCC+1FSP test (Test_6). Output visibilities have defects, remaining work: CIP-2264
      • CBF MCS partially updated to use VCC IDs instead of Receptor IDs. Remaining work: CIP-2238
      Show
      CBF nightly tests updated to run on 4 talon boards. Updated Mid CBF Signal Chain Verification test (XTP-25202) to include a new 4VCC+1FSP test ( Test_6 ). Output visibilities have defects, remaining work: CIP-2264 CBF MCS partially updated to use VCC IDs instead of Receptor IDs. Remaining work: CIP-2238
    • PI24 - UNCOVERED

    • Mid.CBF_SW Team_CIPA
    • Mid G1 Mid G3

    Description

      Continuation of SP-3575.

      Implement a stable and reliable 4-receptor correlator (4 VCCs, 1 FSP) and verify it using the parameterized automated test framework. Note: this is a happy path only, and does not include detailed signal chain verification.

      The flow of data for the happy path test of this correlator can be summarized as:

      Includes:

      • Addressing known bugs with the CBF and parameterized test framework
      • Adding the above happy path test to the PSI CBF nightly regression tests and getting it consistently passing
      • Updating the TMC Simulator to support multiple delay models

      Attachments

        Issue Links

          Structure

            Activity

              People

                r.brederode Brederode, Ray
                R.Huxtable Huxtable, Robert
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (78.57%)

                  Feature Estimate: 5.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   13.0
                  Complete311.0
                  Total414.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel