Mid.CBF 4-Receptor Correlator part 1

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      A reliable 4-receptor correlator is core functionality that is needed for a functional AA0.5 SKA telescope.

      Show
      A reliable 4-receptor correlator is core functionality that is needed for a functional AA0.5 SKA telescope.
    • Hide
      • The nightly tests are updated to run on 4 talon boards.
      • The Mid CBF Signal Chain Verification test (XTP-25202) is updated to include a new test scenario as defined by the Test_6 test parameters.
      • Existing single board correlation tests still pass.
      Show
      The nightly tests are updated to run on 4 talon boards. The Mid CBF Signal Chain Verification test (XTP-25202) is updated to include a new test scenario as defined by the Test_6 test parameters. Existing single board correlation tests still pass.
    • 5
    • 5
    • 0
    • Team_CIPA
    • Sprint 5
    • Hide

      Feature not completed as planned:

      • The nightly tests have been updated to run on 4 talon boards.
      • Various bugs and enhancements to the Mid.CBF have been made that are captured as children of this feature.
      • Because the SLIM functionality (SP-3607) was not finished during PI20, updating the Mid CBF Signal Chain Verification test (XTP-25202) to include a new test scenario as defined by the Test_6 test parameters remains.
      • Other necessary updates moved to SP-3839
      Show
      Feature not completed as planned: The nightly tests have been updated to run on 4 talon boards. Various bugs and enhancements to the Mid.CBF have been made that are captured as children of this feature. Because the SLIM functionality ( SP-3607 ) was not finished during PI20, updating the Mid CBF Signal Chain Verification test (XTP-25202) to include a new test scenario as defined by the Test_6 test parameters remains. Other necessary updates moved to SP-3839
    • 21.5
    • Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • Mid.CBF_SW Team_CIPA

    Description

      Implement a stable and reliable 4-receptor correlator (4 VCCs, 1 FSP) and verify it using the parameterized automated test framework.

      The flow of data for the happy path test of this correlator can be summarized as:

      Includes:

      • Addressing known bugs with the CBF and parameterized test framework
      • Updating CBF to support the ITF PDU
      • Adding the above happy path test to the PSI CBF nightly regression tests and getting it consistently passing
      • Updating the TMC Simulator to support multiple delay models

      Attachments

        Issue Links

          Structure

            Activity

              People

                J.Roy Roy, Jayashree
                R.Huxtable Huxtable, Robert
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 5.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete915.5
                  Total915.5

                  Dates

                    Created:
                    Updated:
                    Resolved: