Details
-
Feature
-
Should have
-
Obs Mgt & Controls
-
-
-
5
-
5
-
0
-
Team_CIPA
-
Sprint 5
-
-
-
-
21.5
-
Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
-
-
Mid.CBF_SW Team_CIPA
Description
Implement a stable and reliable 4-receptor correlator (4 VCCs, 1 FSP) and verify it using the parameterized automated test framework.
The flow of data for the happy path test of this correlator can be summarized as:
Includes:
- Addressing known bugs with the CBF and parameterized test framework
- Updating CBF to support the ITF PDU
- Adding the above happy path test to the PSI CBF nightly regression tests and getting it consistently passing
- Updating the TMC Simulator to support multiple delay models