SKAO network separation from JBO (Continued from PI2)

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Not Assigned
    • PI3
    • None
    • Services
    • Hide

      Network separation from UMAN will allow the SKA Observatory to have full control of its network infrastructure.

      Show
      Network separation from UMAN will allow the SKA Observatory to have full control of its network infrastructure.
    • Hide

      Design report signed off by stakeholders including:

      • Nick Rees (Feature Owner)
      • Darren Hankinson (University of Manchester)
      • Document Contributors (SKA, UoM, JISC)
      Show
      Design report signed off by stakeholders including: Nick Rees (Feature Owner) Darren Hankinson (University of Manchester) Document Contributors (SKA, UoM, JISC)
    • 2
    • 6.5
    • Team_SKANET
    • Sprint 3
    • 13.5
    • PI24 - UNCOVERED

    Description

      The SKA Observatory networks need to be independent from the UMAN networks before the SKA Observatory reaches IGO status. The SKA Observatory must have full control of their network infrastructure. The SKA Observatory will rely heavily on external connectivity to the telescope sites and cloud resources, and therefore requires a reliable and stable connection to the outside world.

      Work with UMAN and JISC to define a number of options that will allow all entities at the Jodrell Bank Observatory to have redundant and reliable external connectivity whilst allowing the SKA Observatory to become independent of the UMAN network infrastructure.

      Create a document that describes each option, and its associated costs, and include a recommended solution.

      _________________________________________________

      This feature is a clone of SP-83. SP-83 was unable to be completed due to a lack of progress with the University of Manchester and JISC. A draft proposal has been created but more information is required in order to complete this document. The following information is still required:

      • Define the requirements for JBO and the Discovery Centre
      • Create detailed physical and logical network diagrams
      • Define the interfaces between each party
      • Define the responsibilities of each party
      • Define the ownership of UoM equipment within the SKA building
      • Provide estimate timescales for implementation
      • Provide costs and define who will pay what

      Once the above information has been defined, the proposal document can be completed.

       

      _________________________________________________

      This feature is a clone of SP-141. The draft proposal has been created and is nearing completion. This proposal document must be approved and signed off during PI3.

       

      Attachments

        Issue Links

          Structure

            Activity

              People

                s.lloyd Lloyd, Sam
                n.rees Rees, Nick
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete73.0
                  Total73.0

                  Dates

                    Created:
                    Updated:
                    Resolved: