Details
-
Feature
-
Must have
-
None
-
Obs Mgt & Controls
-
-
-
1
-
2.5
-
40
-
40
-
USE-39 Operate and Monitor MID Telescope - Basic Flow
-
Team_CREAM
-
Sprint 4
-
-
-
-
14.5
-
Stories Completed, Integrated, Outcomes Reviewed, Accepted by FO
-
-
Team_CREAM
Description
Deliver the basic (but verified/validated and fully documented) observational control functionality for CSP Mid allowing for
1) the allocation of resources to a subarray (EMPTY->IDLE)
2) the configuration of that subarray for a scan (IDLE->READY) and
3)the running of an observational scan using a basic representative set of configurational data.
Note the basic flow does not currently have to allow for failure scenarios but the design and implementation should ensure that this functionality can be added iteratively without requiring re-design or changes.
Attachments
Issue Links
- Child Of
-
SS-90 Reintegrate missing components into SKAMPI
- Done
- depends on
-
SP-2304 Exercise communication between CSP_MID.LMC and MID.CBF MCS
- Done
-
SP-2293 Study of reintegration of CSP into SKAMPI (time-boxed)
- Discarded
- relates to
-
SP-2303 Re-integrate CSP.LMC into SKAMPI
- Done
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- mentioned on