Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2293

Study of reintegration of CSP into SKAMPI (time-boxed)

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Won't have (this time)
    • None
    • None
    • Obs Mgt & Controls
    • Hide

      KR: there is a plan and an effort evaluation for the reintegration of CSP into SKAMPI 

      Show
      KR: there is a plan and an effort evaluation for the reintegration of CSP into SKAMPI 
    • Hide

      A document describing the step needed and evaluating the amount of work needed for CSP.LMC reintegration into SKAMPI.

      Show
      A document describing the step needed and evaluating the amount of work needed for CSP.LMC reintegration into SKAMPI.
    • 2
    • 5
    • 2.5
    • 14.6
    • PI22 - UNCOVERED

    Description

      There is an ongoing effort to re-integrating different software components as part of SKAMPI, following the revised repository structure and CI automation.

      This spike feature (time-boxed) analyze the path and the amount of effort needed to re-integrate CSP.LMC

      Attachments

        Issue Links

          Structure

            Activity

              People

                Adam.Avison Avison, Adam
                c.baffa Carlo Baffa
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel