      Initial integration during PI-8 was limited in functionality. This feature extends the functionality to the larger part of the command functionality covered in the TM-MCCS ICD. This will permit eventually simulation of system operation in the manner the OET is designed to drive, and will enable actions which cover CSP and SDP to demonstrate a complete telescope system.

      Show
      Initial integration during PI-8 was limited in functionality. This feature extends the functionality to the larger part of the command functionality covered in the TM-MCCS ICD. This will permit eventually simulation of system operation in the manner the OET is designed to drive, and will enable actions which cover CSP and SDP to demonstrate a complete telescope system.
    • Hide

      TMC nodes updated to reflect the additional workflows and configuration modes and messages needed from TMC to MCCS

      Current version of MVP integrates and tests cleanly in SKAMPI

      Show
      TMC nodes updated to reflect the additional workflows and configuration modes and messages needed from TMC to MCCS Current version of MVP integrates and tests cleanly in SKAMPI
    • 4
    • 4
    • 5.25
    • Team_NCRA
    • Sprint 5
    • Hide

      As discussed and re-scoped during PI execution, the control commands such as abort, obsreset have been implemented for the scanning state.

      Show
      As discussed and re-scoped during PI execution, the control commands such as abort, obsreset have been implemented for the scanning state.
    • 9.6
    • Stories Completed, Integrated, BDD Testing Passes (no errors), Outcomes Reviewed, NFRS met, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO

    Description

      Continued work on MCCS TMC integration to continue and complete the successful initial integration of MCCS in PI8.

      This feature accounts for the changes in the TMC nodes to support further configuration modes of MCCS as expected under SP-1341 and the integration and testing in SKAMPI

      Attachments

        Structure

          Activity

            People

              v.mohile Mohile, Vivek
              v.mohile Mohile, Vivek
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (100.00%)

                Feature Estimate: 4.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete1424.0
                Total1424.0