Details
-
Feature
-
Not Assigned
-
None
-
None
-
Obs Mgt & Controls
-
-
-
4
-
4
-
5.25
-
Team_NCRA
-
Sprint 5
-
-
-
-
9.6
-
Stories Completed, Integrated, BDD Testing Passes (no errors), Outcomes Reviewed, NFRS met, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
-
-
SPO-870
Description
Continued work on MCCS TMC integration to continue and complete the successful initial integration of MCCS in PI8.
This feature accounts for the changes in the TMC nodes to support further configuration modes of MCCS as expected under SP-1341 and the integration and testing in SKAMPI
Attachments
Issue Links
- is cloned by
-
SP-1595 TMC updates continued for MCCS integration (PI10)
- Done
- relates to
-
SP-1341 Further integration of MCCS into TMC
- Done
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- mentioned on