Details
-
Feature
-
Not Assigned
-
Data Processing
-
-
-
3
-
3
-
3.667
-
Team_SIM
-
Sprint 2
-
-
-
-
7.3
-
-
SDP-Software Team_SIM
-
SPO-542 SPO-567
Description
See description in and https://confluence.skatelescope.org/pages/viewpage.action?pageId=105416556) and capability ADR-8SS-27 for details.
It is strongly suggested that code updates related to this feature are implemented by the end of sprint 4 (at the latest) to allow for integration into SKAMPI and allow sufficient time for collaborating on integration with other elements and contribution to the development of system level tests.
Attachments
Issue Links
- Child Of
-
SS-27 Implement Abort and Restart commands
- Done
- relates to
-
SP-755 SDP MVP can Abort a workflow
- Discarded
-
SP-1000 Implement new subarray state machine (ADR-8)
- Done
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...