CSP, CBF, PSS, PST schemas for resource assignment

    XporterXMLWordPrintable

Details

    • Enabler
    • Should have
    • PI14, PI15
    • None
    • None

    Description

      Coordination is needed in order to structure coherently the details of the configuration schemas for resource assignment and configuration for the different CSP subsystems. 

      The objective of this capability is to provide such a coordination in order to further develop the telescope model repository schemas and examples in order to provide consistent information in the configuration of CSP subsystems. 

      https://ska-telescope.gitlab.io/-/ska-telmodel/-/jobs/2072323606/artifacts/docs/src/_build/html/ska_csp_configure.html

      Attachments

        Issue Links

          Features

          Structure

            Activity

              People

                Unassigned Unassigned
                m.bartolini Bartolini, Marco
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete23.0
                  Total23.0

                  Capability Progress

                    Feature Point Burn-up: (100.00%)

                    Capability Estimate: 3

                    CountFeature Points
                    Todo00
                    In Progress   00
                    Done23
                    Total23

                    Dates

                      Created:
                      Updated:
                      Resolved: