Details
-
Enabler
-
Must have
-
None
-
Obs Mgt & Controls, Services
-
-
- The accuracy of the SW PTP distribution between the LOW CPF and the Pawsey centre is measured
-
-
Overdue
-
Description
As emerged in the analysis of ECP-200049 in https://confluence.skatelescope.org/display/CMI/ECP-200049+%28former+ECP-190009%29+-+Movement+of+LOW+CSP+from+site+to+the+SPC
the implementation plan for the ECP includes a test of the PTP distribution over the long haul link connecting the CPF to the Pawsey centre.
Software PTP seems to be a viable option, but a test would confirm that it reaches the necessary accuracy.
Also a test is useful in identifying what are the software requirements for such solution and if they can be accommodated with the existing software architecture.
This will need contribution from the LOW CBF team, the Network infrastructure setup and the SAT design authority.
Approach, ongoing key steps:
---agree test plan
---ID hardware etc reqd
---purchase hardware etc (CSIRO)
---setup, validate, start test, 15d soak
---analyse results, conclusion, document, publish out
Attachments
Issue Links
Type | Key | Summary | Status | Assignee | ARTs | Agile Teams | FPs | P | FixVersion | Due Sprint | |
---|---|---|---|---|---|---|---|---|---|---|---|
|
Done | Lewis, Peter |
Obs Mgt & Controls
|
Team_PERENTIE
|
2.6 | PI13 | Sprint 5 | ||||
|
Done | Lewis, Peter |
Services
|
Team_PLANET
|
1 | PI13 | Sprint 5 |