      Having an MVP that can be fully traced, and that provides links to all relevant attributes of all TANGO devices involved is the minimum feature set required for deployment in a PSI/ITF/telescope.

      Show
      Having an MVP that can be fully traced, and that provides links to all relevant attributes of all TANGO devices involved is the minimum feature set required for deployment in a PSI/ITF/telescope.
    • Hide

      A SKAMPI tag which can perform the actions above, together with the scripts to setup the environment for the operator in the way that the demo can be reproduced more than one time.

      Show
      A SKAMPI tag which can perform the actions above, together with the scripts to setup the environment for the operator in the way that the demo can be reproduced more than one time.
    • Team_SSMT
    • Sprint 5
    • PI22 - UNCOVERED

    Description

      As a telescope operator, I want to be able to launch an observation from the OET, directly through an SB or through the CLI in at least two subarrays, and be able to see how the behaviour of all elements/resources belonging to each subarray proceed with time, down to the creation of a data product from SDP.

      Such operator should be able to see who the two subarrays proceed independently. It should also be able to make one of the subarrays to go to fault, and a) the other subarray should keep going; b) tracing should be able to determine what was the cause for the FAULT.

      Attachments

        Issue Links

          Features

          Structure

            Activity

              People

                g.leroux Le Roux, Gerhard [X] (Inactive)
                j.santander-vela Santander-Vela, Juande
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Capability Progress

                  Feature Point Burn-up: (100.00%)

                  Capability Estimate: 0

                  CountFeature Points
                  Todo00
                  In Progress   00
                  Done59
                  Total59