Details
-
Capability
-
Should have
-
None
-
Data Processing, Obs Mgt & Controls, Services
-
-
-
Team_SSMT
-
Sprint 5
-
-
-
Description
As a telescope operator, I want to be able to launch an observation from the OET, directly through an SB or through the CLI in at least two subarrays, and be able to see how the behaviour of all elements/resources belonging to each subarray proceed with time, down to the creation of a data product from SDP.
Such operator should be able to see who the two subarrays proceed independently. It should also be able to make one of the subarrays to go to fault, and a) the other subarray should keep going; b) tracing should be able to determine what was the cause for the FAULT.
Attachments
Issue Links
- Parent Of
-
SP-1122 Enable use of transaction IDs to aid in tracing of commands through the system
- Done
-
SP-1162 Workflow library prototype (implementation and examples)
- Done
-
SP-1180 Implement transaction IDs in the SDP prototype
- Done
-
SP-1294 Implement transaction IDs in TMC prototype
- Done
-
SP-1295 Implement transaction IDs in CSP prototype
- Done
- relates to
-
SP-1293 Implement transaction IDs in OET prototype
- Discarded
- supporting
-
ADR-7 Add transaction/coordination ID to configure requests and logs
- decided
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- mentioned on
Type | Key | Summary | Status | Assignee | ARTs | Agile Teams | FPs | P | FixVersion | Due Sprint | |
---|---|---|---|---|---|---|---|---|---|---|---|
|
Discarded | Mort, Ben |
Obs Mgt & Controls
|
1 | |||||||
|
Done | Le Roux, Gerhard [X] (Inactive) |
Obs Mgt & Controls
|
Team_CREAM
|
1 | PI9 | Sprint 2 | ||||
|
Enable use of transaction IDs to aid in tracing of commands through the system |
Done | Bridger, Alan |
Obs Mgt & Controls
|
Team_KAROO
|
3 | PI8 | Sprint 3 | |||
|
Done | Bridger, Alan |
Obs Mgt & Controls
|
Team_SSMT
|
1 | PI8 | Sprint 5 | ||||
|
Done | Le Roux, Gerhard [X] (Inactive) |
Data Processing
|
Team_SIM
|
2 | PI8 | Sprint 5 | ||||
|
Done | Wortmann, Peter |
Data Processing
|
Team_SIM
|
2 | PI8 | Sprint 5 |