Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1180

Implement transaction IDs in the SDP prototype

Details

    • Feature
    • Not Assigned
    • PI8
    • COM SDP SW
    • None
    • Data Processing
    • Hide

      Having an MVP that can be fully traced will greatly help in debugging any issues and is therefore a key requirement for deployment in a PSI/ITF/telescope.

      Show
      Having an MVP that can be fully traced will greatly help in debugging any issues and is therefore a key requirement for deployment in a PSI/ITF/telescope.
    • Hide
      • Transaction ID tags added implementing ADR-7 added to Tango devices (and TBD Processing controller)
      • Contribution to end-to-end testing of tracing in SKAMPI
      • Stretch: Add tracing tags to be able to also trace workflows (could be implemented via the workflow library SP-1162)
      Show
      Transaction ID tags added implementing  ADR-7  added to Tango devices (and TBD Processing controller) Contribution to end-to-end testing of tracing in SKAMPI Stretch: Add tracing tags to be able to also trace workflows (could be implemented via the workflow library SP-1162 )
    • 2
    • 2
    • 13
    • Team_SIM
    • Sprint 5
    • Hide

      Version 0.15.0 of the SDP LMC implements transaction IDs, and this is included in version 0.3.0 of the SDP Helm chart.

      Show
      Version 0.15.0 of the SDP LMC implements transaction IDs, and this is included in version 0.3.0 of the SDP Helm chart.
    • 8.6
    • Stories Completed, Integrated
    • PI22 - UNCOVERED

    • SPO-705

    Description

      Contribution to capability SS-46 to ensure that the SDP element is traceable in a way that can be interpreted with dashboards deployed with SKAMPI.

      Include:

      • Tango devices
      • Processing controller
      • Stretch: Workflows

      Attachments

        Issue Links

          Structure

            Activity

              People

                g.leroux Le Roux, Gerhard [X] (Inactive)
                b.mort Mort, Ben
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete44.0
                  Total44.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel