Demo for System CDR Panel

    XporterXMLWordPrintable

Details

    • Enabler
    • Won't have (this time)
    • PI4
    • None
    • Data Processing, Obs Mgt & Controls, Services
    • Hide

      PI#4 contribution to System CDR demo will help with the following:

      • Show the System CDR panel that software development is working under a well managed process.
      • Show the System CDR panel that software from different teams is being integrated to form the different demos, and that releases and versions are being managed.
      • Show the System CDR panel that software products can be taken by teams different from their original development teams, and still be worked on.
      • Show the System CDR panel that the MVP non-functional requirements are being worked out (this comes from SS-19, but it is produced into a demo for System CDR).
      • Show the System CDR panel the status of Continuous Integration, and its roadmap.
      • Show the System CDR panel progress in different aspects being worked-on by different teams in order to assess the SKA1 design software-wise.

      This will allow the System CDR panel to better assess the status of SKA software development and increase the chances of a successful System CDR.

      Show
      PI#4 contribution to System CDR demo will help with the following: Show the System CDR panel that software development is working under a well managed process. Show the System CDR panel that software from different teams is being integrated to form the different demos, and that releases and versions are being managed. Show the System CDR panel that software products can be taken by teams different from their original development teams, and still be worked on. Show the System CDR panel that the MVP non-functional requirements are being worked out (this comes from SS-19 , but it is produced into a demo for System CDR). Show the System CDR panel the status of Continuous Integration, and its roadmap. Show the System CDR panel progress in different aspects being worked-on by different teams in order to assess the SKA1 design software-wise. This will allow the System CDR panel to better assess the status of SKA software development and increase the chances of a successful System CDR.
    • Hide

      At capability level, acceptance criteria for this capability are:

      • Contributions to the Feature tickets SP-483, SP-484, SP-486 are provided
      • #team-system provides a demo of the Continuous Integration platform, preferably using SKA code, and some slides for System CDR illustrating the CI platform and roadmap.
      • SPMT provides a list of demos to be included into PI#5 planning/PI#4 demo.
      Show
      At capability level, acceptance criteria for this capability are: Contributions to the Feature tickets SP-483 , SP-484 , SP-486 are provided #team-system provides a demo of the Continuous Integration platform, preferably using SKA code, and some slides for System CDR illustrating the CI platform and roadmap. SPMT provides a list of demos to be included into PI#5 planning/PI#4 demo.
    • 8
    • Team_SPMT
    • Hide
      * Google Spreadsheet slides for System CDR on CI
      * List of software demos to be included
      * List of software versions to be used for the different demos
      * Pre-recorded versions of the demo to be used to error-proof the system demo

      PI4 Demonstrations are listed on the following confluence link (includes a recording of the demonstrations):
      https://confluence.skatelescope.org/display/SE/2019-12-02+PI%234+Demo
      Show
      * Google Spreadsheet slides for System CDR on CI * List of software demos to be included * List of software versions to be used for the different demos * Pre-recorded versions of the demo to be used to error-proof the system demo PI4 Demonstrations are listed on the following confluence link (includes a recording of the demonstrations): https://confluence.skatelescope.org/display/SE/2019-12-02+PI%234+Demo
    • PI22 - UNCOVERED

    Description

      Prepare for a demo to be given to the System CDR panel. This Capability triggers features at the Data Processing, Obs. Mgt. & Control, and Other virtual ARTs, taking into account that the System CDR demo needs to be treated as a PI demo.

      One additional detail living at this level, and not at the Solution Level, is the need to show what the Continuous Integration environment is, and what the relevant guidelines, status, and roadmap for that is, as part of the System CDR demo.

      Attachments

        Issue Links

          Features

          Structure

            Activity

              People

                j.santander-vela Santander-Vela, Juande
                r.brederode Brederode, Ray
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 8.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Capability Progress

                    Feature Point Burn-up: (0%)

                    Capability Estimate: 8

                    CountFeature Points
                    Todo00
                    In Progress   00
                    Done00
                    Total00