Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-483

Prepare and Support System CDR Demo - DP Contributions

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Not Assigned
    • PI4
    • None
    • Data Processing
    • Hide

      A number of demos drawn from the data processing prototyping effort are needed for the system SDR demo to highlight key areas of work that reduce risk for SKA construction.

      Show
      A number of demos drawn from the data processing prototyping effort are needed for the system SDR demo to highlight key areas of work that reduce risk for SKA construction.
    • 3.6
    • PI22 - UNCOVERED

    Description

      Identify and help prepare prototyping demos for presentation the system CDR demo. 

      This will involve working with other teams in the DP (virtual) ART, as well as the who pull SS-16 to identify, develop, and prepare the demos to be presented at the System CDR.

      To be considered:

      • The approach and mechanisms for the execution of processing workflows (both within SDP and CSP time domain processing)
      • Prototypes that have reduced the risk and costs of key computational workflows or components.
      • Prototypes of key interfaces between the data processing system and other parts of the telescope
      • Key enablers for generation of simulated test data / test vectors that will support future workflow development.

       

       

      Attachments

        Issue Links

          Structure

            Activity

              People

                j.santander-vela Santander-Vela, Juande
                r.brederode Brederode, Ray
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:
                    Resolved: