Details
-
Capability
-
Must have
-
None
-
MID ART, Data Processing, Obs Mgt & Controls
-
-
-
10
-
REL-1307 ska-oso-scripting v8.0.0 (apply pointing calibration)
REL-1306 CDM v9.1.0 (apply pointing calibration)
REL-1305 OSO PDM v11.5.0 (apply pointing calibration)
REL-1304 Telescope Model v1.15.1 (apply pointing calibration, TMC delay models, MCCS configure)
REL-1293 Refactor TMC Mid According to Latest Decisions in ADR-95 and ADR-76
-
Team_BUTTONS, Team_KAROO, Team_ORCA, Team_SAHYADRI
-
Sprint 5
-
-
-
Description
Miro frame: https://miro.com/app/board/uXjVN4N0K4c=/?moveToWidget=3458764578067802003&cot=14Â
References:
- See Arch sync meeting from 16/01/24 on ADR-76
Attachments
Issue Links
- Is delivered by
-
REL-1293 Refactor TMC Mid According to Latest Decisions in ADR-95 and ADR-76
- Discarded
-
REL-1304 Telescope Model v1.15.1 (apply pointing calibration, TMC delay models, MCCS configure)
- Released
-
REL-1305 OSO PDM v11.5.0 (apply pointing calibration)
- Released
-
REL-1306 CDM v9.1.0 (apply pointing calibration)
- Released
-
REL-1307 ska-oso-scripting v8.0.0 (apply pointing calibration)
- Released
- relates to
-
SP-4029 TMC Dish Pointing (ADR-95 and ADR-76)
- Done
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
- mentioned on
Type | Key | Summary | Status | Assignee | ARTs | Agile Teams | FPs | P | FixVersion | Due Sprint | |
---|---|---|---|---|---|---|---|---|---|---|---|
|
Done | Vrcic, Sonja |
Obs Mgt & Controls
|
Team_HIMALAYA, Team_SAHYADRI
|
5.5 | PI22, PI23 | Sprint 5 |