Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-93

Software architecture overview

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Hide

      To contribute to the Design Baseline Description and so support a successful System CDR as well as providing a top-level description of the software design to benefit all stakeholders who need an introduction to the SKA system.

      Show
      To contribute to the Design Baseline Description and so support a successful System CDR as well as providing a top-level description of the software design to benefit all stakeholders who need an introduction to the SKA system.
    • Hide

      Agree with Feature Owner and Design Baseline Description lead the scope of this task which will be suitable for the resource available for this PI. Develop the agreed sections of the document and have them reviewed and approved by:

      • Telescope Delivery Team nominee
      • Design Baseline Description lead
      • Feature Owner.
      Show
      Agree with Feature Owner and Design Baseline Description lead the scope of this task which will be suitable for the resource available for this PI. Develop the agreed sections of the document and have them reviewed and approved by: Telescope Delivery Team nominee Design Baseline Description lead Feature Owner.
    • 5
    • 5
    • 2.6
    • Team_SARCH
    • 2.6
    • PI24 - UNCOVERED

    • PI2_DEMO Team_SARCH

    Description

      OUTCOME:

      https://drive.google.com/drive/folders/18Dps_hT01_EzBrz8jRtlOZb21rA0iBeW
       

      Contribute to the software chapter/paragraphs of the Design Baseline Description (DBD).

      This includes descriptions and diagrams respectively in google doc and draw.io 

      only for reference Gerhard's email:

      1. Sections to be written for Peter’s DBD. Not yet sure exactly how this work, in-depth discussions with PD in progress. What I expect is that help may be required in the following:
        1. Description of Science Data Processing (based on SDP CDR info), with suitable diagrams
        2. Description of Pulsar Signal Processing (based on PSS/PST CDR info), with suitable diagrams
        3. Description of Control & Monitoring based on TM CDR info, with suitable diagrams
        4. Description of Mid & Low-specific features of PSS, PST & SDP
        5. Description of Mid & Low-Specific Control & Monitoring based on TM CDR info
        6. An overview/description of the SW Architecture (need to still figure out if anything is needed in addition to the a) to e) above.

      Attachments

        1. BD_ToC_2019jan23.pdf
          93 kB
          Rees, Nick
        2. Dewdney_DBD_2019mar12_v2.pptx
          2.48 MB
          Caiazzo, Marco
        3. Guidelines_writing_BD_sections_2018dec05.pdf
          46 kB
          Rees, Nick
        4. image001.png
          34 kB
          Rees, Nick

        Issue Links

          Structure

            Activity

              People

                n.rees Rees, Nick
                m.bartolini Bartolini, Marco
                Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 5.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete1824.0
                  Total1824.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel