PSI platform requirements

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Services
    • Hide

      If we are to deploy the DP and OMC MVPs on a timescale of Q4 2020 we need to start now to understand and cost the hardware and platform software requirements.

      Show
      If we are to deploy the DP and OMC MVPs on a timescale of Q4 2020 we need to start now to understand and cost the hardware and platform software requirements.
    • Hide

      Short report (confluence page or equivalent) which collects, describes, and provides a draft costed plan for the hardware and platform software to support running the OMC and DP MVPs at the MID and LOW PSIs.

      If limited capacity is available, initial focus should be on the Mid-PSI requirements as this plan is more advanced.

       

       

      Show
      Short report (confluence page or equivalent) which collects, describes, and provides a draft costed plan for the hardware and platform software to support running the OMC and DP MVPs at the MID and LOW PSIs. If limited capacity is available, initial focus should be on the Mid-PSI requirements as this plan is more advanced.    
    • 1
    • 1
    • 10
    • Sprint 1
    • Hide

      Preliminary report here: https://docs.google.com/document/d/1Xdv5CaFvSYsKljPLh984X3ICiRzt4whkv-NeYMtgVNc/edit

      Further work is needed to confirm requirements and working assumptions re. scope for both PSIs to then finalise this document.

      Furthermore, funding models need to be better understood. In the case of LOW PSI, CSIRO are expecting to pay for the kit but the budget will place constraints on things. The picture re. MID PSI funding is less clear to me.

      Show
      Preliminary report here: https://docs.google.com/document/d/1Xdv5CaFvSYsKljPLh984X3ICiRzt4whkv-NeYMtgVNc/edit Further work is needed to confirm requirements and working assumptions re. scope for both PSIs to then finalise this document. Furthermore, funding models need to be better understood. In the case of LOW PSI, CSIRO are expecting to pay for the kit but the budget will place constraints on things. The picture re. MID PSI funding is less clear to me.
    • 6.2
    • PI22 - UNCOVERED

    Description

      Needs to include input from all elements to be deployed (TM, SDP, CSP?, DISH?) or being considered to be deployed (PSS, PST) at the PSI.

      Outcome should be costed plan on how much (and what types of) off-the-shelf hardware need to be procured, and what platform software needs to be installed for a PSI deployment. Initial focus on PSI Mid.

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.deegan Deegan, Miles
                b.mort Mort, Ben
                Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 1.0

                  IssuesStory Points