Description
EMI/EMC pre-compliance testing is required to ensure that the TALON-DX board and TALON LRU designs will meet the relevant non-functional requirements. If there are issues in these areas, then detecting and addressing them early will save money. The following activities are planned for this feature:
- TALON LRU with two TALON-DX signal processing boards is assembled.
- Test firmware that exercises the FPGA and board level components in a representative manner is installed on each TALON-DX board.
- A suitable contractor is found to execute an EMI/EMC pre-compliance test campaign.
- Test results are reviewed and a report written on the path forwards to full compliance testing.