Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-4864

Investigate interface Requirements from TANGO to Low Power subsystems

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Not Assigned
    • PI25
    • None
    • PI24 - UNCOVERED

    • Team_SST
    • Low G3

    Description

      Investigate interface Requirements from TANGO to Low Power subsystems

      Explore and define the interface requirements for Low Power subsystems with TMC.

      At this point it is not clear what monitoring points and archiving will be useful. This will involve discussions with the Operations teams, Design Leads for Power and understanding the documentation for the Power Subsystems. Based on these Initial requirements for what monitoring points are needed through this interface could be identified that would be useful from the points of view of the telescope operators and engineering.  

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                r.brederode Brederode, Ray
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel