TANGO to external products / interfaces mapping by product

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      A review of the intended interface requirements to TANGO from external products that existed at the Design stage, and any gaps in these will guide the roadmap for this work and our planning of future features. It also provides a basis for discussions with the Design Leads for these external products.

      Show
      A review of the intended interface requirements to TANGO from external products that existed at the Design stage, and any gaps in these will guide the roadmap for this work and our planning of future features. It also provides a basis for discussions with the Design Leads for these external products.
    • Hide

      A spreadsheet that identifies TANGO interface to external products / sub-systems and monitoring points defined as requirements in the Design / JAMA

      Show
      A spreadsheet that identifies TANGO interface to external products / sub-systems and monitoring points defined as requirements in the Design / JAMA
    • PI24 - UNCOVERED

    • Team_SST
    • Low G3

    Description

      TANGO to external products / interfaces mapping by product

      It is planned to build interfaces from external products, which may have their own control and monitoring or data acquisition (such as BMS, Weather Monitoring etc. as defined below) to TANGO. As the size of the telescope grows, it is useful to do this to consolidate key aspects of monitoring into a single integrated solution and reduce the dispersion of information across different systems. Dashboards in TMC and archival data on monitoring points to be persisted in the Engineering Data Archive is a natural choice.

      As part of this effort, review and mapping of the intended interface requirements to TANGO from external products that existed at the Design stage is necessary. This highlights what the interface intends to achieve, identifies any gaps, and will guide the roadmap for this work and our planning of future features. It also provides a basis for discussions with the Design Leads for these external products. This involves  understanding the JAMA requirements in Design and ICDs for these external systems as well as interaction with the Operations teams to identify what is needed from the interfaces and monitoring and archiving needs. 

       

      The products and systems to be considered for developing the mapping include:

      • Building Management System
      • Weather Monitoring Station
      • Power: Power distribution and monitoring of backup power generation
      • Network Manager (software that monitors the performance of the networking infrastructure)
      • Rack Power and Temperature Monitoring (where not otherwise monitored)
      • Power and Signal Distribution interface update for rev2 of the hardware and firmware (for the Low Telescope stations)

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                r.brederode Brederode, Ray
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel