      Progressing the BMS Tango interface gives us the ability to provide the key BMS monitoring points in TMC dashboards and allows us to archive in the EDA. This eventually allows operators to view consolidated monitoring in a single integrated solution and reduce the need to seek information from different systems. 

      Show
      Progressing the BMS Tango interface gives us the ability to provide the key BMS monitoring points in TMC dashboards and allows us to archive in the EDA. This eventually allows operators to view consolidated monitoring in a single integrated solution and reduce the need to seek information from different systems. 
    • Hide

      A clear interface architecture document the for BMS-TANGO integration is developed and reviewed.
      Initial version of the monitoring points requirements to be downloaded from BMS into TANGO are identified based on discussions with the Operations Team representatives.

      Show
      A clear interface architecture document the for BMS-TANGO integration is developed and reviewed. Initial version of the monitoring points requirements to be downloaded from BMS into TANGO are identified based on discussions with the Operations Team representatives.
    • PI24 - UNCOVERED

    • Team_WOMBAT
    • Low G3

    Description

      Define Interface Requirements for Low BMS Integration with TANGO

      Explore and define the interface requirements for integrating the Building Management System (BMS) with TANGO software for the Low Telescope.

      This involves  understanding the documentation for the BMS as well as interaction with the Design Lead to define the interface specifications including the protocol standards, as well as developing a robust interface architecture. Initial requirements for what monitoring points are needed through this interface will also have to be identified through interactions with the Telescope Operations team especially for the points of view of the telescope operators and engineering.  

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                r.brederode Brederode, Ray
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0