CLONE - Initiate the implementation of ECP-230134, updating SPS-CBF SPEAD time fields

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • LOW ART
    • Hide
      • The implementation of the ECP is initiated, keeping pace with the changes on the CBF side. The SPEAD headers should be shown to be using the revised time-stamping format up to the point implemented by the CBF team so that integration tests show that the CBF accepts the data.
      • Any necessary changes should also be made to the DAQ RX stack, so that it can receive the new format.
      Show
      The implementation of the ECP is initiated, keeping pace with the changes on the CBF side. The SPEAD headers should be shown to be using the revised time-stamping format up to the point implemented by the CBF team so that integration tests show that the CBF accepts the data. Any necessary changes should also be made to the DAQ RX stack, so that it can receive the new format.
    • 1.5
    • 1.5
    • 0
    • Team_MCCS
    • Sprint 5
    • 21.6
    • PI24 - UNCOVERED

    • Team_MCCS mccs_firmware mccs_software
    • Low G3

    Description

      Confluence page ECP-230134 - Update time fields in the LOW CBF - SPS ICD describes changes to be made to time-stamping, relating to ADR-77 and ADR-78.

      This will require wide-ranging changes to the hardware / software stack.

      As discussed in PI 21 planning, the team should being the implementation in PI21, keeping pace with the changes on the CBF side being done by Perentie so that the SPS-CBF integration uses identical headers on both sides.

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                S.Melhuish Melhuish, Simon
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.5

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete413.0
                  Total413.0