  2. SP-3681

ITF Integration

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Must have
    • PI19
    • None
    • Obs Mgt & Controls
      • Show good understanding of CSP-Low
      • Fulfill contractual obligations
      • Identify potential issues in processes and requirements
    • 7
    • 7
    • 0
    • Team_TOPIC
    • Sprint 5
    • 19.5
    • PI24 - UNCOVERED

    • Team_TOPIC

    Description

      Conduct the SRR

      • (L2 requirement review is done)
      • Review ICDs (and add relevant interfaces to JAMA as requirements - postpone this to PI#20?)
        • Focus on LMC-CBF requirements
        • Check existing interface requirements
        • Familiarize with JSON command input templates
        • Verification test method has to be defined for all requirements
        • We need a TMC-LMC ICD - to be discussed with Andrea K
        • How to deal with the (location of / changes to) ICDs? To be discussed with e.g. Daniel H in PI#19

      Rob to set up meeting with Jacque to define how the CSP Low SRR will be conducted in PI#19.

      Attachments

        Issue Links

          Structure

            Activity

              People

                s.valame Valame, Snehal
                D.VanDerSchuur Van Der Schuur, Daniel
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 7.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete5329.700005
                  Total5329.700005

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel