Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-3359

LOW CBF Correlator integration with CSP LMC LOW

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
      • CSP LOW LMC is part of the overall control hierarchy
      • CSP LMC has a greater understanding of the current correlator capabilities
      • Tests include CSP LMC in them instead of being bypassed 
      • successful demonstration that CSP LMC is part of the correlator control hierarchy
      • both CSP LMC and LOW CBF agree on the current status of the interface and propose any future modifications
    • 1
    • 0.75
    • 0
    • Team_PERENTIE
    • Sprint 2
    • Hide

      The LMC-CBF integration did not take priority during PI#19 due to the resource impact on the Perentie Team. However we have completed required bug fixes and softare released by the Cream Team:

      We consider the feature is not completed and unfortunately we won't progress more in PI#19. The LMC integration activitiy will continue as part of the PI#20 feature SP-3640 LOW CBF Substation Correlator

      Show
      The LMC-CBF integration did not take priority during PI#19 due to the resource impact on the Perentie Team. However we have completed required bug fixes and softare released by the Cream Team: Released LOW CBF softare 0.5.7 for the race condition we have also investigated BareFoot gRPC server issue we have also started a training doc for Cream Team on how to use the LOW CBF system here: https://docs.google.com/document/d/1uGryAGOgilC6uOPG0WRvzXqLNR_zkxosX2fG0VyBdso/edit#heading=h.i8edewyaipq0 We consider the feature is not completed and unfortunately we won't progress more in PI#19. The LMC integration activitiy will continue as part of the PI#20 feature SP-3640 LOW CBF Substation Correlator
    • 19.6
    • PI22 - UNCOVERED

    • Team_PERENTIE solution-goal-1
    • SOL-G1

    Description

      • implement the changes made to the assign resources, configure and scan commands for the subarray
      • increase the level of understanding of correlator design
      • rerun tests from PI#18 to include LMC in the deployed system controlling LOW CBF

      Attachments

        Structure

          Activity

            People

              s.vrcic Vrcic, Sonja
              y.chen Chen, Yuqing
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Feature Progress

                Story Point Burn-up: (100.00%)

                Feature Estimate: 1.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete11.0
                Total11.0

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Structure Helper Panel