    • Obs Mgt & Controls
    • Hide
      • To have a substation correlator available for use
      • To enable shorter integration times in the correlator
      • To provide greater flexibility in the correlator configuration
      • To improve the test coverage of the correlator by include PTC#5,6 and 7
      • Will force SKAO to think about how substations are handled in the telmodel or other schemes
      Show
      To have a substation correlator available for use To enable shorter integration times in the correlator To provide greater flexibility in the correlator configuration To improve the test coverage of the correlator by include PTC#5,6 and 7 Will force SKAO to think about how substations are handled in the telmodel or other schemes
    • Hide
      • PTC#5 - visibility data ordering passes without errors
      • PTC#6 - correlator processed bandwidth passes without errors
      • Description of the correlator documentation is updated
      • To create larger visibility packets and confirm correct reception in SDP
      • Control of substations and integration time is provided to LMC and the configuration schema updated
      • PTC#7 - correlator timing passes without errors
      Show
      PTC#5 - visibility data ordering passes without errors PTC#6 - correlator processed bandwidth passes without errors Description of the correlator documentation is updated To create larger visibility packets and confirm correct reception in SDP Control of substations and integration time is provided to LMC and the configuration schema updated PTC#7 - correlator timing passes without errors
    • 5.25
    • 5.25
    • 0
    • Team_PERENTIE
    • Sprint 4
    • Hide

      The feature was demonstrated as part of the LOW CBF AA0.5 FAT: https://docs.google.com/presentation/d/1IGzjvcGCaf8S9G4WUY08Q55S2bbzMq-B0iMJckAnoRM/edit#slide=id.g27c22ac8a1f_0_0

      The AA0.5 FAT presentation includes the test results recorded in Jama.

      Show
      The feature was demonstrated as part of the LOW CBF AA0.5 FAT: https://docs.google.com/presentation/d/1IGzjvcGCaf8S9G4WUY08Q55S2bbzMq-B0iMJckAnoRM/edit#slide=id.g27c22ac8a1f_0_0 The AA0.5 FAT presentation includes the test results recorded in Jama.
    • 20.6
    • Demonstrated, Satisfies Acceptance Criteria
    • PI22 - UNCOVERED

    • Team_PERENTIE

    Description

      • Enable substations to be processed in the correlator
      • The number of substations/stations will be limited to 22 in PI#20 (results in 8296Byte jumbo packets), and this will exercise more of the correlator functionality (the number of stations in AA1 is 18, and number of substations 512 - this will be worked upon in future PI’s)
      • LOW CBF to inform CSP LMC how substations are processed in the correlator and the limits (substations, channels = floor(1024 virtual channels / (4*ceil(22 stations/4)))=42)
      • LOW CBF to devise a scheme to create a temporary 22 substations in the telmodel database to describe their locations
      • Execute PTC#5 - visibility data ordering to check that the ordering is correct
      • Execute PTC#6 - Correlator processed bandwidth to measure the bandwidth processed for stations and substation is as expected for one Alveo
      • Enable 0.283s LOW CBF correlator configurations in the subarray configuration command
      • LOW CBF to inform CSP LMC how 0.283s integrations are configured in the correlator
      • Execute PTC#7 - correlator timing to check that the timestamps are correct

      Attachments

        Issue Links

          Structure

            Activity

              People

                Hariharan.Krishnan Krishnan, Hariharan
                y.chen Chen, Yuqing
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 5.25

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete1222.0