Details
-
Feature
-
Must have
-
None
-
None
-
Services
-
-
-
Inter Program
-
1.5
-
6
-
0
-
Team_SKANET
-
-
-
21.3
Description
Due to ECP 2000049 and a number of ECPs for other products interfacing with the network, the design for the LOW long haul has changed and needs to be recorded in a document as the baseline design. Also we need the document to incorporate the design at AA0.5, AA1, AA2, AA3* AA4. The work for this document will be the pre-cursor for netterain to be updated as the single source of truth. We should also include the connectivity to the SPS cabinets and clearly show how the design progresses through the releases.
Produce Kit list for the BOM for the LOW networks contract for AA1-AA4.