Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2739

SKA MID & SKA LOW (SKAMPI) Landing page enhancements

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Data Processing
    • Hide

      The landing page for MID and LOW deployments for SKA software enables users (engineers and operators) to quickly find relevant monitoring and control interfaces for interacting with the system. 

      Show
      The landing page for MID and LOW deployments for SKA software enables users (engineers and operators) to quickly find relevant monitoring and control interfaces for interacting with the system. 
    • Hide
      • Complete SKAMPI dashboard work started in PI15 and integrate into the persistent software deployment in the "operations sandbox"
      • Demo to stakeholders and collect feedback for further improvement later in the PI (if time allows) or for PI17.
      Show
      Complete SKAMPI dashboard work started in PI15 and integrate into the persistent software deployment in the "operations sandbox" Demo to stakeholders and collect feedback for further improvement later in the PI (if time allows) or for PI17.
    • Inter Program, Intra Program
    • 3
    • 3
    • 0
    • Team_NALEDI
    • Sprint 5
    • Hide

      Persistent and repeatable deployment of the landing page: it does work however but it cannot be deployed as the original skeletons in the repo were all customised.
      Landing page deployment: https://sdhp.stfc.skao.int/dp-naledi/home/
      QA Metrics are included in the landing page
      https://sdhp.stfc.skao.int/dp-naledi/home/observations/qaMetrics
      SDP Product Dashboard is included in the landing page (used to say ‘Monitoring’)
      This is the data product dashboard.
      https://sdhp.stfc.skao.int/dp-naledi/home/resources/sdp
      Presentation of the landing page via appropriate social vehicles (Demonstration & Slack Channels): this has not been done and is scheduled for early PI17.
      This is deferred to Sprint 2 of next PI as things took longer to do than envisaged. May make a video before end of year.

      Show
      Persistent and repeatable deployment of the landing page: it does work however but it cannot be deployed as the original skeletons in the repo were all customised. Landing page deployment: https://sdhp.stfc.skao.int/dp-naledi/home/ QA Metrics are included in the landing page https://sdhp.stfc.skao.int/dp-naledi/home/observations/qaMetrics SDP Product Dashboard is included in the landing page (used to say ‘Monitoring’) This is the data product dashboard. https://sdhp.stfc.skao.int/dp-naledi/home/resources/sdp Presentation of the landing page via appropriate social vehicles (Demonstration & Slack Channels): this has not been done and is scheduled for early PI17. This is deferred to Sprint 2 of next PI as things took longer to do than envisaged. May make a video before end of year.
    • 18.2
    • Stories Completed, Integrated, Outcomes Reviewed, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • Team_NALEDI
    • DP-SDP: G1

    Description

      Tagging as 'COM TMC Software' as this is arguably the closest match but the component does not really map well to a PBS item so the link is a bit tenuous.

      Attachments

        Issue Links

          Structure

            Activity

              People

                g.leroux Le Roux, Gerhard [X] (Inactive)
                b.mort Mort, Ben
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete1745.0
                  Total1745.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel