CLONE of SP-2356:
Outcomes from SP-2356:
- A branch for reintegration of the OET into SKAMPI was created
- A number of BDD tests have been written, but not all are passing, for various reasons
- The work for this ticket was demonstrated on Thursday 26 May
- Cross-team code review will take place early in PI15 and the OET will then finally be reintegrated into SKAMPI.
Work moved to PI15 in CLONE Feature:
<TBD>
Description from PI14
This feature has been reduced in scope as a consequence of TMC limitations:
- Functionality needed will only be that to do with the allocation of resources.
Deliver the basic (but verified/validated and fully documented) script execution functionality for OET when running in the Mid telescope that allows for the following basic steps to be done.
1) the allocation of resources to a subarray (EMPTY->IDLE)
2) the configuration of that subarray for a scan (IDLE>READY) and-
3) the running of an observational scan using a basic representative set of configurational data.
Note the basic flow does not currently have to allow for failure scenarios but the design and implementation should ensure that this functionality can be added iteratively without requiring re-design or changes.
Note this feature also includes the general planning/reviews and design overhead to achieve the above goals and to this end subsumes the following features originally placed on the board: