USE-39 Operate and Monitor MID Telescope - Basic Flow
-
Team_BUTTONS
-
Sprint 5
-
-
-
-
14.6
-
Stories Completed, Outcomes Reviewed, Demonstrated, Accepted by FO
-
-
Team_BUTTONS
Description
This feature has been reduced in scope as a consequence of TMC limitations:
- Functionality needed will only be that to do with the allocation of resources.
Deliver the basic (but verified/validated and fully documented) script execution functionality for OET when running in the Mid telescope that allows for the following basic steps to be done.
1) the allocation of resources to a subarray (EMPTY->IDLE)
2) the configuration of that subarray for a scan (IDLE>READY) and-
3) the running of an observational scan using a basic representative set of configurational data.
Note the basic flow does not currently have to allow for failure scenarios but the design and implementation should ensure that this functionality can be added iteratively without requiring re-design or changes.
Note this feature also includes the general planning/reviews and design overhead to achieve the above goals and to this end subsumes the following features originally placed on the board:
Attachments
Issue Links
- Child Of
-
SS-90 Reintegrate missing components into SKAMPI
- Done
- clones
-
SP-2195 Re-enable OET deployment and testing with SKAMPI
- Done
- is cloned by
-
SP-2619 CLONE - Observational Execution of the basic instruction set of an OET script on Mid
- Done
- relates to
-
SP-2116 Implement changes identified in components interfacing to TMC post SS-82
- Discarded
-
SP-2327 CLONE - Re-enable OET deployment and testing with SKAMPI