Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2604

Review System Requirements (SRR), ICDs, ECPs

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Could have
    • PI15
    • None
    • Obs Mgt & Controls
    • Hide

      Lets TOPIC team contribute to SRR.

      Show
      Lets TOPIC team contribute to SRR.
    • 3
    • 3
    • 3
    • 1
    • Team_TOPIC
    • Sprint 5
    • Hide

      See linked stories

      Show
      See linked stories
    • 16.6
    • Stories Completed, Integrated, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI22 - UNCOVERED

    • Team_TOPIC

    Description

      TOPIC team will be integrating and verifying the CSP.LOW. As a first step the team should understand the existing requirements including ICDs, current status, relevant ECPs to be taken into account. One of the aims will be to participate in the SRR.

       

      This feature represents the split of SP-2491to ensure that no feature is too big. 

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                v.mohile Mohile, Vivek
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete515.0
                  Total515.0