Familiarization with processes,tools, CSP Low products

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Must have
    • PI15
    • None
    • Obs Mgt & Controls
    • Hide

      Prepares the TOPIC team to be ready for their primary objectives of integration and verification by understanding the as-is situation. Also needed to enable them to meaningfully contribute to the SRR

      Show
      Prepares the TOPIC team to be ready for their primary objectives of integration and verification by understanding the as-is situation. Also needed to enable them to meaningfully contribute to the SRR
    • 3
    • 3
    • 40
    • 13.333
    • Team_TOPIC
    • Sprint 5
    • Hide

      Done and demonstrated in demo 15.6

      Show
      Done and demonstrated in demo 15.6
    • 15.6
    • Stories Completed, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • Team_TOPIC

    Description

      The purpose of system appreciation is to achieve a high level system understanding of CSP LOW components and its status.

      TOPIC team will be integrating and verifying the CSP.LOW. As a first step the team should understand the existing requirements including ICDs, current status, relevant ECPs to be taken into account. One of the aims of the system appreciation will be to participate in the SRR.

      This covers all the components they will be responsible for integrating and verifying including CBF, CSP.LMC PSS PST and would have to interface with these teams to understand and document. This will also help establish a path forward for the integration and verification of the CSP in the PSI when it is established.

      Attachments

        Issue Links

          Structure

            Activity

              People

                v.mohile Mohile, Vivek
                v.mohile Mohile, Vivek
                Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete1027.0
                  Total1027.0

                  Dates

                    Created:
                    Updated:
                    Resolved: