Project Execution Plan development

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • 8
    • 8
    • 0
    • Team_SPMT
    • Overdue
    • PI24 - UNCOVERED

    • SARCH_Interest Team_SPMT

    Description

      The Project Engineering Plan (PEP) will require a number of inputs from the SAFe train. Significant content may be required for:

      • Construction Project Definition
      • Staffing
      • Risk and Opportunity Management
      • Engineering
      • Configuration Control
      • Acquisitions
      • Project Management Controls
      • Quality and Product Assurance
      • Computing (in terms of project IT, Cyber-Security and Data Management)

      All of these should clarify how the project can be managed in a coherent, lean, way whilst integrating both Agile and non-Agile components. The largest area will be the Engineering section which presents a coherent Software and System Engineering Management Plan.

      Attachments

        Issue Links

          Structure

            Activity

              People

                n.rees Rees, Nick
                r.brederode Brederode, Ray
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 8.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete13.0
                  Total13.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel