Details
-
Enabler
-
Must have
-
None
-
Obs Mgt & Controls
-
-
2
-
2
-
40
-
20
-
Team_KAROO
-
Sprint 5
-
-
-
-
14.6
-
Stories Completed, Solution Intent Updated, Outcomes Reviewed, Satisfies Acceptance Criteria, Accepted by FO
-
-
DISH.LMC Team_KAROO
Description
The following activities are needed before implementation can begin on Dish LMC software due to the Dish Structure changes and to ensure the design is refined and kept up to date:
- evolve/maintain the Dish LMC requirements with the eye on updated CS Guidelines (including simpler alarm system design) and SKA software design (for instance, logging being not part of TMC anymore),
- re-consider DISH.LMC design (review dsh-lmc-prototype design and support decisions on the re-allocation of pointing correction and ra/dec to az/el translation functions; ensure solution intent reflects decision),
- detailed mapping between the DISH state and mode indicators (and state machines) and the SKA state machine indicators). This is needed so that TMC knows how to interpret DISH states and modes.