Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2115

Integration and regression testing of the TMC MVP post SS-82; Identify bugs to be fixed

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Must have
    • PI14
    • None
    • True
    • Obs Mgt & Controls
    • Hide

      Ensures that the entire MVP integrates well post the refactoring in SS-82

      Show
      Ensures that the entire MVP integrates well post the refactoring in SS-82
    • Hide

      All regression testing completed and test results documented;

      Document identifying needed changes in other components;

      Possible features proposed to Product Management

      Show
      All regression testing completed and test results documented; Document identifying needed changes in other components; Possible features proposed to Product Management
    • 2
    • 0
    • 13.6
    • PI23 - UNCOVERED

    Description

      SS-82 has led to a significant refactoring and restructuring of the TMC in a bid to fix the issues in SKAMPI. Work on SS-82 is being continued under SS-86 especially refactoring the SubArray and Leaf Node. While testing based on these further changes is a continuing exercise there is a need to ensure that integration of TMC at this point with other components and that all tests created for the previous MVP integration (prior to SS-82) are run comprehensively and issues identified. Some of these are expected to be fixed on the fly to allow integration and tests to proceed further, others may need to be logged in SKB and staged for later. Further these issues would reveal possible changes that other components interfacing to the TMC will need and these should be identified, at a high level at least and features proposed.

      Attachments

        Issue Links

          Structure

            Activity

              People

                g.leroux Le Roux, Gerhard [X] (Inactive)
                v.mohile Mohile, Vivek
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel