Details
-
Enabler
-
Could have
-
None
-
True
-
Data Processing
-
-
-
Inter Program, Intra Program
-
2
-
2
-
1
-
-
-
13.6
Description
Time-boxed feature for introducing Execution Blocks (ADR-33) and revising the interface (ADR-16). This should put us into a good place for dealing with AA0.5 engineering activities (for which we might need separate EBs) as well as put us into a good position to tackle more advanced features down the line (more complex resource negotiation and commensality).--
Attachments
Issue Links
- Child Of
-
SS-90 Reintegrate missing components into SKAMPI
- Done
- relates to
-
ADR-16 Resolve start and end of EBs from SDP perspective
- decided
-
SP-1897 Demonstrate integration and configuration of initial QA metrics and display for visibility receive workflow
- Done
-
ADR-41 Architectural Location for Execution Blocks
- decided
-
ADR-54 Scan configuration metadata for SDP
- decided