Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1887

Contribute to revised integration and acceptance testing of SDP in SKAMPI

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Must have
    • PI12
    • COM SDP SW
    • None
    • Data Processing
    • Hide

      Having a robust testable solution for the integration of SKA software products/systems is very much key to the success of the project both for AA0.5 and in the longer term.

      Contributing to this activity is important to ensure that it is a success and by contributing to this activity we will be participating in knowledge sharing across the ARTs, something that will be vital when developing new acceptance tests of a robust SKA software deployment that includes SDP.

      Show
      Having a robust testable solution for the integration of SKA software products/systems is very much key to the success of the project both for AA0.5 and in the longer term. Contributing to this activity is important to ensure that it is a success and by contributing to this activity we will be participating in knowledge sharing across the ARTs, something that will be vital when developing new acceptance tests of a robust SKA software deployment that includes SDP.
    • Hide
      • Timeboxed activity to contribute to the task team being created for SS-82. Possibly present on:
        • SDP sub-system test solution developed for SP-1610
        • SDP control system design using configuration database
      • Capture and socialise next steps in approach to the integration of SDP with other SKA software (via SKAMPI)
        • e.g. how to adapt LMC such that it is compatible with the long-running commands proposal
      Show
      Timeboxed activity to contribute to the task team being created for SS-82 . Possibly present on: SDP sub-system test solution developed for SP-1610 SDP control system design using configuration database Capture and socialise next steps in approach to the integration of SDP with other SKA software (via SKAMPI) e.g. how to adapt LMC such that it is compatible with the long-running commands proposal
    • 3
    • 3
    • 100
    • 33.333
    • Team_ORCA
    • Sprint 5
    • Hide

      We have participated in the architecture sync and MVP meetings to track the progress of SS-82. The work has not required any direct involvement from the ORCA team because it has focussed on refactoring the TMC central node and the CI pipeline infrastructure. (Notes from these meetings about things that may be relevant to SDP have been captured in the linked Spike tickets.)

      We made a presentation about testing SDP with simulated component failures at an MVP meeting. As part of this, we sought advice about a better way how to control the Tango devices in the tests. This led us to investigate TangoGQL as a way of controlling the Tango devices, which has subsequently been implemented in the tests (see SP-1884 and SP-1845).

      The implementation of the long-running commands in the Tango base classes was released in sprint 12.5 so there has not been time to investigate how to adapt this for the SDP Tango devices.

      Show
      We have participated in the architecture sync and MVP meetings to track the progress of SS-82 . The work has not required any direct involvement from the ORCA team because it has focussed on refactoring the TMC central node and the CI pipeline infrastructure. (Notes from these meetings about things that may be relevant to SDP have been captured in the linked Spike tickets.) We made a presentation about testing SDP with simulated component failures at an MVP meeting. As part of this, we sought advice about a better way how to control the Tango devices in the tests. This led us to investigate TangoGQL as a way of controlling the Tango devices, which has subsequently been implemented in the tests (see SP-1884 and SP-1845 ). The implementation of the long-running commands in the Tango base classes was released in sprint 12.5 so there has not been time to investigate how to adapt this for the SDP Tango devices.
    • 12.5
    • Stories Completed, Outcomes Reviewed, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    Description

      Timeboxed activity for an active DP ART contribution in the SKAMPI/SS-82 task team. The direction of this work is intended to be driven by discussions following the task team meetings at and after PI12 planning. This ticket is created in addition to work on improvements to SDP code (eg. SP-1845, SP-1884, SP-1857, and SP-1886) which are also intended to contribute to the robustness of SDP which should also prove useful when SDP is integrated and tested with other SKA software.

      See notes in SS-82 and associated confluence page https://confluence.skatelescope.org/display/SE/SS-82+Make+sure+SKAMPI+is+stable+for+developers+and+users for more details. 

      Attachments

        Issue Links

          Structure

            Activity

              People

                p.wortmann Wortmann, Peter
                f.graser Graser, Ferdl
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete71.5
                  Total71.5

                  Dates

                    Created:
                    Updated:
                    Resolved: