Details
-
Enabler
-
Must have
-
None
-
Obs Mgt & Controls
-
-
4
-
4
-
40
-
10
-
Team_KAROO
-
Sprint 4
-
-
-
-
12.6
-
Stories Completed, Integrated, Solution Intent Updated, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
-
-
Cross_Team_Code_Review
SS-54Team_KAROO
Description
The purpose of this Feature is to update the TANGO Base Classes with the outcome of the https://jira.skatelescope.org/browse/SP-1640 Reference design and implementation of the asynchronous (long running) commands.
Detailed description of the work completed in PI11 and plan for 12 is available on Confluence
Attachments
Issue Links
- depends on
-
SP-1640 Reference design and implementation for asynchronous (long-running) commands
- Done
- is required by
-
SP-1627 TANGO Base Class Controller implements long-running commands that trigger operational state transitions
- Done
-
SP-1628 TANGO Base Class Subarray implements long running commands that trigger observing state transitions
- Done
-
SP-1984 MCCS adoption of long running command implementation in the tango_base_classes
- Done
-
SP-2077 Refactor and release long running command implementation in ska-tango-base
- Done
-
SP-1794 TMC asynchronous communication
- Done
- relates to
-
SS-54 Review of Control Systems guidelines and refactoring of implementation
- Done
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...