Relate a subset of Verification Requirements defined in AIV MID Continuous Integration Roadmap to Software Tests and resultant reports

Details

    • Enabler
    • Not Assigned
    • PI11
    • None
    • Services
    • Hide

      The verification of requirements defined in the AIV MID Continuous Integration Plan is currently an unknown / undefined process. If one such set of requirements that relate to preferably an integration point early in the plan can be identified, defined in Gherkin (BDD), and related Python tests can be produced, the process will be better understood from the viewpoints of both the AIV and the (T/P)DTs, and the software teams (SAFe).

      A proper definition of such a process can assist with building a bridge between the AIV planning documentation and the agile software work streams.

      Show
      The verification of requirements defined in the AIV MID Continuous Integration Plan is currently an unknown / undefined process. If one such set of requirements that relate to preferably an integration point early in the plan can be identified, defined in Gherkin (BDD), and related Python tests can be produced, the process will be better understood from the viewpoints of both the AIV and the (T/P)DTs, and the software teams (SAFe). A proper definition of such a process can assist with building a bridge between the AIV planning documentation and the agile software work streams.
    • Hide
      • A SUT is identified for early testing in a PSI (or ITF?)
      • One test (or tests) is (are) identified from the AIV MID Continuous Integration (CI) Roadmap and added to Jira (XTP)
        • ICD/L1 requirements are used to generate a test scenario/requirement
        • The test set is translated in Gherkin language and incorporated in the SKAMPI repository
        • Gitlab CI Pipeline is not blocked by failing tests
      • The process of test creation related to the AIV MID CI Roadmap can be demonstrated or is documented
      Show
      A SUT is identified for early testing in a PSI (or ITF?) One test (or tests) is (are) identified from the AIV MID Continuous Integration (CI) Roadmap and added to Jira (XTP) ICD/L1 requirements are used to generate a test scenario/requirement The test set is translated in Gherkin language and incorporated in the SKAMPI repository Gitlab CI Pipeline is not blocked by failing tests The process of test creation related to the AIV MID CI Roadmap can be demonstrated or is documented
    • 3
    • 3
    • 0
    • Team_ATLAS
    • Sprint 5
    • Overdue
    • Show
      WIP: https://confluence.skatelescope.org/display/SE/SP-1773+PSI+Mid+System+Integration+Test+1
    • PI22 - UNCOVERED

    • testing

    Description

      A Continuous Integration (CI) Roadmap for the MID AIV exists. (This could perhaps rather be called Continuous Product Integration but should be discussed).

      The tooling is available to connect a test executed in the CI pipeline of SKAMPI to a Jira-based X-Ray report. Between the two extremities, a process is required to translate verification requirements (L1/2/3) to these tests, so that these test results can be interrogated at the appropriate times.

      The purpose of this enabler is to demonstrate how the CI Roadmap can assist the SAFe Solution teams with generating their release roadmaps, by creating relevant Gherkin scenarios and test plans and translating them into Python tests.

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.bartolini Bartolini, Marco
                A.DeBeer De Beer, Adriaan
                Votes:
                0 Vote for this issue
                Watchers:
                7 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (61.11%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do47.0
                  In Progress   00.0
                  Complete611.0
                  Total1018.0