Description
A Continuous Integration (CI) Roadmap for the MID AIV exists. (This could perhaps rather be called Continuous Product Integration but should be discussed).
The tooling is available to connect a test executed in the CI pipeline of SKAMPI to a Jira-based X-Ray report. Between the two extremities, a process is required to translate verification requirements (L1/2/3) to these tests, so that these test results can be interrogated at the appropriate times.
The purpose of this enabler is to demonstrate how the CI Roadmap can assist the SAFe Solution teams with generating their release roadmaps, by creating relevant Gherkin scenarios and test plans and translating them into Python tests.
Attachments
Issue Links
- relates to
-
SP-1624 Advances to MVP testing and SKA Testing Runway as a product
- Done
-
SP-1939 Define System Under Test (SUT 1) for MID PSI
- Done
- links to
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...