Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1674

Initial prototype of AA0.5 RCAL pipeline functionality

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Must have
    • PI11
    • COM SDP SW
    • None
    • Data Processing
    • Hide

      One or more simple RCAL pipelines, capable of generating complex gain solutions for a boresight tied array beam for SKA MID and LOW and pointing solutions for MID is anticipated to be required for early Array Assemblies (possibly as early as AA0.5). We must make a start on these as soon as possible if we are to allow sufficient time for a number of iterations towards a solution before AA0.5 (~Q1 2023).

      Show
      One or more simple RCAL pipelines, capable of generating complex gain solutions for a boresight tied array beam for SKA MID and LOW and pointing solutions for MID is anticipated to be required for early Array Assemblies (possibly as early as AA0.5). We must make a start on these as soon as possible if we are to allow sufficient time for a number of iterations towards a solution before AA0.5 (~Q1 2023).
    • Hide

      Timeboxed development of an initial prototype of AA0.5 RCAL pipeline functionality (for generating calibration solution for a bore-sight tied array beam). 

      Collaboration with SP-1671 to identify requirements for test data sets for the pipeline(s) begin developed 

      Not expected to be integrated into the SDP system in PI11, but must be working towards achieving this by PI13-14 (or before if possible).

      A solution developed and issues encountered in the development of this pipeline captured in confluence and/or providing tickets in ART-level backlog.

      Show
      Timeboxed development of an initial prototype of AA0.5 RCAL pipeline functionality (for generating calibration solution for a bore-sight tied array beam).  Collaboration with SP-1671 to identify requirements for test data sets for the pipeline(s) begin developed  Not expected to be integrated into the SDP system in PI11, but must be working towards achieving this by PI13-14 (or before if possible). A solution developed and issues encountered in the development of this pipeline captured in confluence and/or providing tickets in ART-level backlog.
    • 4
    • 4
    • 12
    • Team_SIM
    • Sprint 5
    • Hide

      Requirements for simulations and pipeline were discussed with the FO and stakeholders, and the outcome is captured on this Confluence page:

      https://confluence.skatelescope.org/display/SE/Requirements+for+RCAL+pipelines+for+MID+and+LOW+AA0.5

      The pipeline has been written as a RASCIL command-line program, which is described here:

      https://ska-telescope.gitlab.io/external/rascil/apps/rascil_rcal.html

      The results from testing the pipeline on the simulations are described here:

      https://confluence.skatelescope.org/display/SE/Testing+the+RCAL+pipeline

      Show
      Requirements for simulations and pipeline were discussed with the FO and stakeholders, and the outcome is captured on this Confluence page: https://confluence.skatelescope.org/display/SE/Requirements+for+RCAL+pipelines+for+MID+and+LOW+AA0.5 The pipeline has been written as a RASCIL command-line program, which is described here: https://ska-telescope.gitlab.io/external/rascil/apps/rascil_rcal.html The results from testing the pipeline on the simulations are described here: https://confluence.skatelescope.org/display/SE/Testing+the+RCAL+pipeline
    • 14.2
    • Stories Completed, Demonstrated, Satisfies Acceptance Criteria
    • PI22 - UNCOVERED

    Description

      Needs to be discussed with r.laing or M.Serylak at PI planning.

      Initial prototype of AA0.5 RCAL pipeline functionality (for generating calibration solution for a bore-sight tied array beam)

      Not expected to be integrated into the SDP system in PI11, but must be working towards achieving this by PI13-14 (or before if possible)

      Attachments

        Issue Links

          Structure

            Activity

              People

                b.mort Mort, Ben
                f.graser Graser, Ferdl
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 4.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete613.0
                  Total613.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel