Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1560

Continuing to build up infrastructure in the PSI Low

Details

    • Feature
    • Not Assigned
    • PI10
    • None
    • Services
    • Hide

       

      • AC1: Coordinate the receiving of new equipment (2 new TPMs v1.6, subrack, etc), and its installation and connection in PSI Low. This includes configuring the network as needed, and purchasing a 40G cable as needed to connect TPMs to CBF. This will involve a close collaboration with the MCCS and Perentie teams.
      • AC2: Record all new HW received and installed, including SW, in the PSI Low configuration table and diagram. This includes both the TPM equipment but also any other HW that is installed, such as CBF, PST. Once all the new equipment is recorded, the configuration table and diagram should be reviewed and released.
      • AC3: Determine what additional equipment is needed in PI#11, such as the 100G switch. If needed, make a plan to procure this.

       

      Show
        AC1: Coordinate the receiving of new equipment (2 new TPMs v1.6, subrack, etc), and its installation and connection in PSI Low. This includes configuring the network as needed, and purchasing a 40G cable as needed to connect TPMs to CBF. This will involve a close collaboration with the MCCS and Perentie teams. AC2: Record all new HW received and installed, including SW, in the PSI Low configuration table and diagram. This includes both the TPM equipment but also any other HW that is installed, such as CBF, PST. Once all the new equipment is recorded, the configuration table and diagram should be reviewed and released. AC3: Determine what additional equipment is needed in PI#11, such as the 100G switch. If needed, make a plan to procure this.  
    • 1.9
    • 1.9
    • 11.053
    • Team_VULCAN
    • Sprint 5
    • Hide

      Supported Perentie with receiving, installing & connecting new 2x TPM's - Done
      Support Perentie with networking of the new 2x TPM's - Done

      Updated config table and diagram in line with new equipment - https://app.diagrams.net/#G1IiCVFTzaOeHQTxXAu9xji8pYc8rjvqeE
      Confluence page: https://confluence.skatelescope.org/display/SE/PSI+-+Configuration+Management

      Execute the aavs scripts from one of the K8s nodes by moving them from MACE server - Not done
      Determine need for 100G switch, plan and procure if needed - Done

      Show
      Supported Perentie with receiving, installing & connecting new 2x TPM's - Done Support Perentie with networking of the new 2x TPM's - Done Updated config table and diagram in line with new equipment - https://app.diagrams.net/#G1IiCVFTzaOeHQTxXAu9xji8pYc8rjvqeE Confluence page: https://confluence.skatelescope.org/display/SE/PSI+-+Configuration+Management Execute the aavs scripts from one of the K8s nodes by moving them from MACE server - Not done Determine need for 100G switch, plan and procure if needed - Done
    • 10.6
    • Integrated, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI22 - UNCOVERED

    • Team_VIOLA
    • SPO-1005

    Description

      This Feature captures VIOLA's contribution to SPO-1059 as follows:

      • Coordinate the receiving of new equipment (2 new TPMs v1.6, subrack, etc), and its installation and connection in PSI Low. This includes configuring the network as needed, and purchasing a 40G cable as needed to connect TPMs to CBF. This will involve a close collaboration with the MCCS and Perentie teams.
      • Record all new HW received and installed, including SW, in the PSI Low configuration table and diagram. This includes both the TPM equipment but also any other HW that is installed, such as CBF, PST. Once all the new equipment is recorded, the configuration table and diagram should be reviewed and released.
      • Determine what additional equipment is needed in PI#11, such as the 100G switch. If needed, make a plan to procure this.

      Attachments

        Structure

          Activity

            People

              m.bartolini Bartolini, Marco
              d.hayden Hayden, Daniel
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Feature Progress

                Story Point Burn-up: (100.00%)

                Feature Estimate: 1.9

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete59.0
                Total59.0

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Structure Helper Panel