Details
-
Feature
-
Must have
-
None
-
Obs Mgt & Controls
-
-
-
2
-
2
-
8
-
4
-
Team_CREAM
-
Sprint 2
-
-
-
-
13.4
-
Stories Completed, BDD Testing Passes (no errors), Outcomes Reviewed, NFRS met, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
-
-
CSP.LMC Team_CREAM technical_debt
Description
The CSP.LMC has grown in size and complexity and during last PIs got a complete refactoring. The implementation of the new configuration (ADR - 18) and the (very minimal) test of ADR-22 are completed.
To fully benefits of all above improvement and to proceed in the way of System integration aimed at the implementation of a real word control system, the CSP.LMC needs to be complemented by an array of fault condition tests. These check tools will give short and long term benefits in both development effort and maintenance costs.
This feature is a follow-up of the Refactoring of CSP.LMC (SP-1513 onward).
Attachments
Issue Links
- depends on
-
SP-1513 Refactoring of CSP.LMC - part 2 - Subarrays and ObsDevices
- Done
-
SP-1514 Refactoring of CSP.LMC - part 3 - Master/Control Refactoring
- Done
-
SP-1512 Refactoring of CSP.LMC - part 1 - Draft plan
- Done
- relates to
-
SS-54 Review of Control Systems guidelines and refactoring of implementation
- Done
- mentioned in
-